Last weekend closure of I-24 in Nashville coming

NASHVILLE, Tenn. (AP) -- After a summer of weekend closures, construction on a section of Interstate 24 on Nashville's east side should wrap up this weekend.

The Tennessee Department of Transportation said a three-mile section of I-24 between I-40 and I-65 will be shut down at 9 p.m. on Friday and will be reopened by 5 a.m. Monday. That stretch has been closed for most weekends during the summer for major rehabilitation of two bridges over city streets.

Then traffic will be reduced to one lane in each direction overnights Monday through Wednesday to install reflectors that won't interfere with snowplowing and to score the road shoulders.

Finishing the work depends on weather, but no rain is in the forecast.


Join the Conversation!

To comment, the following rules must be followed:

  • No Obscenity, Profanity, Vulgarity, Racism or Violent Descriptions
  • No Negative Community Comparisons
  • No Fighting, Name-calling, or Personal Attacks
  • Multiple Accounts are Not Allowed
  • Stay on Story Topic

Comments may be monitored for inappropriate content, but the station is under no legal obligation to do so.
If you believe a comment violates the above rules, please use the Flagging Tool to alert a Moderator.
Flagging does not guarantee removal.

Multiple violations may result in account suspension.
Decisions to suspend or unsuspend accounts are made by Station Moderators.
Links require admin approval before posting.
Questions may be sent to webmaster@wvlt-tv.com. Please provide detailed information.

powered by Disqus

WVLT VOLUNTEER TV

6450 Papermill Drive Knoxville, TN 37919 Phone - (865) 450-8888; Fax - (865) 450-8869
Gray Television, Inc. - Copyright © 2014 WVLT-TV Inc. - Designed by Gray Digital Media - Powered by Clickability 167191995 - local8now.com/a?a=167191995