Daytona frontstretch getting $400M facelift

DAYTONA BEACH, Fla. (AP) -- Daytona International Speedway is getting another facelift.

Three years after a complete repaving project, the famed track is getting a revamped frontstretch that will enhance the "fan experience."

International Speedway Corp. estimates the redesign with cost about $400 million. The project is scheduled to begin July 5 and is targeted for completion in January 2016, in time for the Rolex 24 At Daytona and the Daytona 500.

The redesign includes expanded entrances and a series of escalators and elevators to transport fans to three different concourse levels, each featuring spacious and strategically-placed social "neighborhoods" along the nearly mile-long frontstretch. Those 11 neighborhoods, each measuring the size of a football field, will allow fans to meet and socialize during events without ever missing any on-track action.


Join the Conversation!

To comment, the following rules must be followed:

  • No Obscenity, Profanity, Vulgarity, Racism or Violent Descriptions
  • No Negative Community Comparisons
  • No Fighting, Name-calling, or Personal Attacks
  • Multiple Accounts are Not Allowed
  • Stay on Story Topic

Comments may be monitored for inappropriate content, but the station is under no legal obligation to do so.
If you believe a comment violates the above rules, please use the Flagging Tool to alert a Moderator.
Flagging does not guarantee removal.

Multiple violations may result in account suspension.
Decisions to suspend or unsuspend accounts are made by Station Moderators.
Links require admin approval before posting.
Questions may be sent to webmaster@wvlt-tv.com. Please provide detailed information.

powered by Disqus

WVLT VOLUNTEER TV

6450 Papermill Drive Knoxville, TN 37919 Phone - (865) 450-8888; Fax - (865) 450-8869
Gray Television, Inc. - Copyright © 2014 WVLT-TV Inc. - Designed by Gray Digital Media - Powered by Clickability 212054531